Awarded the prestigious European Innovation Award, the latest Twin vans redefine compact luxury with a loft-style interior, panoramic SunRoof, a versatile dining setup, and a sustainable EPP cabinet construction—setting new standards in comfort and eco-conscious design.
Sustainability
-
-
GEN-I Group and Energija projekt d.d. have extended their flexibility purchase agreement and market PPA for Croatia’s largest wind farm, Senj (156 MW), introducing an innovative SPOT+ pricing model to hedge production and enhance financial stability.
-
The Šalek Valley is undergoing a major green transition, with HSE and TEŠ leading investments in floating solar power, hydrogen technology, and district heating restructuring, aiming to reduce emissions, create jobs, and ensure Slovenia’s sustainable energy future.
-
The MULTI-E project, completed after six years, introduced over 300 electric vehicles, 74 ultra-fast charging stations, and clean public transport solutions across Slovenia, Croatia, and Slovakia, significantly advancing sustainable mobility in the region.
-
HSE and the municipalities of Trbovlje and Hrastnik have signed a renewable energy cooperation agreement, ensuring 10% of Prapretno solar plant’s electricity is supplied at cost price for public institutions, marking a major step in Slovenia’s green transition.
-
Construction and Civil Engineering
A Slovenian-Croatian group led by Iskra to build Dubrovnik’s wastewater treatment system
by SBA Slovenian-Croatian consortium led by Iskra, including Hidroinženiring, Alfaplan, and Elmap, has been chosen to build a major wastewater treatment plant in Dubrovnik, encompassing 73,000 PE capacity, a 350-meter hydraulic tunnel, and an 835-meter submarine discharge, significantly expanding water infrastructure for over 78,000 residents.
-
GEN-I awarded €100,000 in funding to three winning sustainability projects in Slovenia, supporting marine biodiversity, passive greenhouse technology, and mobile renewable energy solutions, reinforcing its commitment to the green transition and ESG innovation.
-
At the end of this summer, the Petrol Group successfully installed and commissioned the 85th solar power plant as part of its strategic Petrol Green project aiming at installing solar power plants on roofs of Petrol’s service stations and other buildings. This achievement attests to Petrol’s commitment to energy self-sufficiency …
-
GEN-I Group has launched its second large-scale solar power plant in North Macedonia, a 12 MW facility near Kavadarci that will generate up to 15,500 MWh of carbon-free energy annually, reinforcing its commitment to renewable energy expansion and CO2 reduction.
-
Renewables
GEN-I and Energija projekt’s wind farm at Senj is a systems solution to the issue of electricity network stability
by SBSenj wind farm, Croatia’s largest at 156 MW, has transitioned to full operation and joined the GEN-I Group’s virtual power plant, enhancing grid stability and maximizing renewable energy efficiency through advanced energy management and aggregation.